Free LADBS NEC Standard Electrical Load Calculation Form in PDF Make Your Document Now

Free LADBS NEC Standard Electrical Load Calculation Form in PDF

The LADBS NEC Standard Electrical Load Calculation form is a crucial document used to determine the electrical load requirements for various types of buildings and installations. This form ensures that electrical systems are designed to safely handle the expected demand, promoting both safety and efficiency. Understanding how to accurately complete this form is essential for anyone involved in construction or electrical work in Los Angeles.

Make Your Document Now

Similar forms

The LADBS NEC Standard Electrical Load Calculation form serves as an essential tool for electrical load assessments. Several other documents share similarities in purpose and structure. Below is a list of eight documents that are comparable to the LADBS NEC form, highlighting their similarities.

  • NEC Load Calculation Worksheet: This document also assists in determining electrical loads, using similar formulas and methodologies to ensure compliance with safety standards.
  • California Articles of Incorporation: This form is essential for establishing a corporation in California, outlining its key details and ensuring legal recognition. For more information, visit https://documentonline.org.
  • Electrical Service Load Calculation Form: This form is utilized to calculate the total service load for residential or commercial properties, paralleling the LADBS form in its approach to load assessment.
  • Energy Audit Report: An energy audit report evaluates energy consumption and identifies potential savings, mirroring the LADBS form's focus on efficient load management.
  • Commercial Electrical Load Calculation Guide: This guide outlines the steps for calculating loads in commercial settings, sharing a common goal of ensuring adequate electrical capacity.
  • Residential Load Calculation Guide: Similar to the LADBS form, this guide provides a framework for assessing electrical needs in residential buildings, focusing on safety and efficiency.
  • Utility Service Application: When applying for utility services, this document often requires load calculations, aligning with the LADBS form's purpose of verifying electrical requirements.
  • Power Demand Calculation Sheet: This sheet helps in estimating power demand for various applications, utilizing similar principles as the LADBS form to ensure proper load distribution.
  • Building Permit Application for Electrical Work: This application often requires load calculations to ensure compliance with local codes, reflecting the LADBS form's role in maintaining safety standards.

Document Sample

NEC Standard Electrical Load Calculation for Single Family Dwellings

(Only for Service Ratings of 120/240V, 225 Amps Max)

 

 

Owner:

 

 

 

 

Location:

 

 

 

 

 

 

 

Total Floor Area of Dwelling (NEC 220.12)

 

 

 

 

 

 

 

 

 

SQFT.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Factor

 

 

 

 

 

 

 

 

Quantity

 

 

Volt Amperes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

“General Lighting”

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

General Lighting (SQFT X 3 VA/SQ FT (Table 220.12)

3 X

sqft.

 

 

 

2.

Small Appliance Circuits (1500 VA per circuit)

(NEC

1500 X

 

 

 

 

 

220.52(A)) (minimum 2)

 

 

 

 

 

 

 

 

 

 

 

3.

Laundry Circuit (1500 VA per circuit) (NEC 220.52(B))

1500 X

 

 

 

 

4.

Total General Lighting Load (Add lines 1, 2 & 3):

 

 

 

 

 

 

 

 

5.

First 3000 VA @ 100%:

 

 

 

 

 

 

 

 

 

3000

6.

Total General Lighting Load – 3000 =

 

 

@ 35%=

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.

Net General Lighting Load (Per NEC 220.42) (Add lines 5 & 6):

 

 

 

 

 

 

 

 

 

 

 

 

*Fixed Appliances(if insufficient space, use back):

 

 

YES

NO

 

 

 

Garbage Disposal

 

 

 

 

 

 

 

 

 

 

 

 

 

Bathroom Fan

 

 

 

 

 

 

 

 

 

 

 

 

 

Microwave

 

 

 

 

 

 

 

 

 

 

 

 

 

Dishwasher

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total

 

 

 

8.

3 or less Appliances,

Total Appliance VA;

 

 

 

 

 

 

 

 

 

 

 

 

4 or more Appliances,

75% of Total Appliance VA (NEC 220.53):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Other Loads (including motors, EV charger(s), etc.)

 

 

YES

NO

 

Nameplate Rating

 

 

 

(VA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9. Electric

Range (8000VA or Nameplate)**

 

 

 

 

 

 

 

 

 

 

 

10. HVAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11.

Electric

Oven

 

 

 

 

 

 

 

 

 

 

 

 

 

12.

Electric

Dryer (5000 VA minimum)**

 

 

 

 

 

 

 

 

 

 

 

13.

Electric

Vehicle Charger

 

 

 

 

 

 

 

 

 

 

14.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15.

Other:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16.

25% of largest motor (NEC 430.24)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Service Load Volt-Amperes (VA) (Add lines 7, 8 & 9 thru 16) =

 

 

 

 

Total Service Load Volt-Amperes / 240-volts =

 

 

Amperes

 

 

 

 

***Service Rating (Amperes)=

*For every “YES” answer, indicate VA rating of equipment

**Nameplate rating must be used if larger

***Service Rating shall be greater than or equal to the Service load

As a covered entity under Title II of the Americans with Disabilities Act, the City of Los Angeles does not discriminate on t he basis of disability and, upon request will provide reasonable accommodation to ensure equal access to its programs, services and activities.

NEC Standard Electrical Load Calculation (Rev. 03-23-2016)

www.ladbs.org

Key takeaways

When completing the LADBS NEC Standard Electrical Load Calculation form, it is essential to understand several key aspects to ensure accuracy and compliance.

  • Accuracy is critical: Double-check all calculations and inputs to avoid errors that could lead to safety hazards or compliance issues.
  • Understand the load types: Familiarize yourself with different electrical loads, such as lighting, receptacles, and appliances, to correctly categorize and calculate their demands.
  • Follow the guidelines: Adhere to the guidelines provided by the LADBS to ensure that the form is filled out correctly and meets all local requirements.
  • Documentation is important: Keep copies of the completed form and any supporting documents for future reference or inspections.

Utilizing the form effectively can streamline the process of electrical load calculation and contribute to a safer electrical system.

Instructions on How to Fill Out LADBS NEC Standard Electrical Load Calculation

Completing the LADBS NEC Standard Electrical Load Calculation form is an essential step in ensuring that your electrical system meets safety and efficiency standards. By accurately filling out this form, you will provide the necessary information for evaluating your electrical load requirements. The following steps will guide you through the process.

  1. Gather necessary information about your electrical appliances and systems, including wattage ratings and usage patterns.
  2. Obtain the LADBS NEC Standard Electrical Load Calculation form from the appropriate local authority or their website.
  3. Begin with the general information section. Fill in your name, address, and contact information accurately.
  4. Identify the type of occupancy for the space being evaluated. This could include residential, commercial, or industrial designations.
  5. List all major electrical appliances and equipment. Include details such as the number of units and their respective wattages.
  6. Calculate the total load for each category of appliances. Ensure to follow any specific guidelines provided on the form.
  7. Complete the section for demand factors, if applicable. This involves applying any relevant demand factors to your total load calculations.
  8. Review all entries for accuracy. Check that all calculations are correct and that no information is missing.
  9. Sign and date the form to certify that the information provided is true and accurate to the best of your knowledge.
  10. Submit the completed form to the appropriate department for review, along with any required supporting documents.

After submission, you may need to follow up with the local authority to ensure that your application is being processed. Be prepared to provide additional information if requested.